Munster/Dyer Main Street station
Jump to navigation
Jump to search
Munster/Dyer Main Street | |||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|
General information | |||||||||||
Coordinates | 41°31′22″N 87°31′05″W / 41.522680°N 87.518028°W | ||||||||||
Owned by | NICTD | ||||||||||
Line(s) | NICTD West Lake Corridor CSX Monon Subdivision | ||||||||||
Tracks | 1 NICTD 1 CSX | ||||||||||
Construction | |||||||||||
Accessible | Yes | ||||||||||
History | |||||||||||
Opening | 2025 | ||||||||||
Electrified | Yes (1500 V DC) | ||||||||||
Services | |||||||||||
| |||||||||||
|
Munster/Dyer Main Street is a planned South Shore Line rail station located at the foot of Main Street on the border of Munster and Dyer, Indiana. The station and main parking lot itself will reside solely within Munster town limits while additional parking and a maintenance facility will reside within the Dyer town limits. [1] The station will be constructed adjacent to the CSX Monon Subdivision, but will utilize new tracks.[2] Intended to serve as the southern terminus of the West Lake Corridor,[2][3][4] it is expected to open to revenue service in 2025.[1] Dyer Amtrak station is located about 1⁄2 mile (0.8 km) to the south.
References
[edit]- ^ a b "Holcomb announces construction to begin on the West Lake Corridor Project". The Crusader. October 31, 2020. Archived from the original on November 1, 2020. Retrieved November 1, 2020.
- ^ a b Steele, Andrew (October 28, 2020). "WATCH NOW: 8-mile rail line from Hammond to Dyer is on way". The Times of Northwest Indiana. Retrieved November 1, 2020.
- ^ Simón, Marisol R.; Noland, Michael; Federal Transit Administration; USDoT; US Army Corps of Engineers (December 2, 2016). West Lake Corridor Draft Environmental Impact Statement (Chapter 2: Alternatives Considered) (PDF) (Report). NICTD. Retrieved July 16, 2017.
- ^ "Chapter 2 Alternatives Considered" (PDF). NICTD. Retrieved July 18, 2020.